Perspective

KANW is under construction and the steel and concrete block erection is well underway. The project includes the addition and remodel of the existing radio station headquarters located on Coal Avenue. Portions of the existing building are being remodeled including the entry, reception, store and toilet rooms. A second floor is being added which will include offices and a vocational classroom for high school students.

The new addition includes steel frame and light gauge framing, a new elevator shaft and new stairs to the second floor. Other primary construction materials include stucco, storefront windows, roofing, insulation, polished concrete, gypsum board, architectural steel fabrication, carpet tile, porcelain tile and casework. Baker A+D is looking forward to continuing to work with APS on this exciting project.
Posted by Baker A+D at 02:40 PM | 0 Comments | Post a comment

Firm Profile

image
Baker Architecture + Design provides full architectural services with a concentration on developing creative modern solutions utilizing contemporary materials and technologies appropriate to the climate and indigenous architecture of New Mexico. Read More »

News

EPMS Among Top Ranked LEED Buildings In State The Ernie Pyle 6th Grade Building and Fine Arts Building have been ranked among the top LEED Certified buildings in the State of New Mexico, both bringing home LEED for Schools Gold Certification. The 116 panel solar array, recycled blue jean insulation, xeriscaping, efficient plumbing fixtures, acoustic analysis, and ample… Read More »

Polls

What do you think of the proposal to develop the Bosque?